Carpenter Flashcard Match
Online Red Seal Exam Preparation, built on official standardsSet up a round
Cards from
Pairs per round
Blocks
Decoys
200 cards to draw from
Your rounds
Kept on this device- 80%10 pairs · 4:12TodayRetry the wrong ones
- 70%10 pairs · 4:40TodayRetry the wrong ones
- 87%15 pairs · 6:05YesterdayRetry the wrong ones
- 100%10 pairs · 3:3111 NovPlay again
- 60%5 pairs · 2:2010 NovRetry the wrong ones
Checking
What a checked pair looks likeChecking
Clock
How a round works
Each card is the front of a flashcard from the set you chose.
Drag it onto its answer, or tap the card and then the answer. Every miss shows the right pair and the why behind it.
Browse the 20 free cards and explanations
Unused powder-actuated cartridges are left overnight in an open tray beside a wet doorway. What storage correction is needed?
Answer: Put the cartridges in their designated secure, clean, dry storage.
Powder-actuated cartridges must be protected from moisture and unauthorized access. The tool-and-cartridge storage procedure applies to unused cartridges as well as to equipment.
Exam trap: An open tray is convenient for loading but does not provide protected, secure overnight storage.
Standard reference: RSOS 2022 A-1.03.04P
A pipe rack blocks a vertical lift path. The work platform must reach over the rack without resting on it. What capability must be verified when selecting a mobile access platform?
Answer: A rated elevated reach path that clears the rack and supports the required platform load at the work position.
Select the platform using its actual reach envelope and rated capacity through the required movement. A nominal platform height does not establish that it can reach over an obstruction safely.
Exam trap: Standing on a rack or improvising an extension is not a substitute for verifying the platform's approved reach.
Standard reference: RSOS 2022 A-3.02.01P
What is the purpose of a contract change order in the project specifications record?
Answer: To record an authorized change to contracted work and its agreed consequences.
A change order forms part of the contract-document record when an authorized change is made. It identifies the changed scope and any agreed effects on contract price or time.
Exam trap: An unanswered request for clarification does not by itself establish an authorized contract change.
Standard reference: RSOS 2022 B-5.02.01L
A scheduled delivery must reverse across the site's only pedestrian entry. What site-preparation arrangement is needed during unloading?
Answer: Create a controlled delivery area and a safe alternative pedestrian entry route during the vehicle movement.
Site access must accommodate both delivery operations and people. Arrange separation before unloading so pedestrians are not routed through the reversing vehicle's operating area.
Exam trap: A warning alone leaves the only pedestrian entry crossing the reversing path.
Standard reference: RSOS 2022 B-6.02.02P
A fixed 600 mm deck opening surrounds a 200 mm trunk. The trunk centre is 100 mm left of the opening centre. The detail requires 150 mm clearance each side. Which side is deficient, and by how much?
Answer: The left clearance is deficient by 50 mm.
Each centred clearance would be (600 − 200)/2 = 200 mm. The 100 mm leftward offset reduces the left clearance to 100 mm and increases the right to 300 mm. The left is 150 − 100 = 50 mm short.
Exam trap: The total 400 mm space around the trunk does not guarantee the specified clearance on each individual side.
Standard reference: RSOS 2022 B-7.04.04P
A rectangular falsework grid has vertical-plane braces and plumb posts. Its top grid can still rack into a parallelogram in plan. What part of the approved restraint arrangement must be checked?
Answer: The horizontal-plane bracing that restrains plan racking of the grid.
Bracing acts in the plane of its arrangement. Plumb posts and vertical-plane braces do not establish resistance to a top grid racking horizontally; check the designed horizontal restraint before loading.
Exam trap: Replumbing individual posts alone does not restrain the observed plan deformation of the connected grid.
Standard reference: RSOS 2022 C-8.02.06P
A slab was revised from 200 to 220 mm thick with its underside unchanged. An embed template still holds a weld-plate face 200 mm above that underside. The plate must be flush with the revised top. What adjustment is needed?
Answer: Raise the plate face 20 mm to the revised finished-slab elevation and verify it from the benchmark.
The revised top is 220 - 200 = 20 mm higher because the underside is unchanged. The obsolete template would recess the face by that amount; the embed must follow the revised surface datum.
Exam trap: Keeping the old template position because the underside has not moved ignores the change in slab thickness and top elevation.
Standard reference: RSOS 2022 C-8.05.09P
Hot-weather curing requires retained moisture and a concrete surface no warmer than 32°C. Identical trial slabs under black and white plastic retain moisture, but read 36°C and 29°C respectively. Which cover meets both requirements?
Answer: The white plastic cover under these trial conditions.
Both covers retain moisture, so temperature distinguishes them. The white-covered trial remains below the supplied 32°C limit; the black-covered trial exceeds it. Reflective white protection reduces solar heating in hot weather.
Exam trap: Choosing black solely because it retains moisture ignores the separate concrete-temperature limit and the measured trial result.
Standard reference: RSOS 2022 C-9.02.03P
An engineered floor service chase has 230 mm clear width. A duct is 200 mm wide before 20 mm insulation is added on each side. Does the completed duct fit without changing the framing?
Answer: No. Its finished width is 240 mm, exceeding the clear chase by 10 mm.
Coordination uses the completed service envelope: 200 + 2 × 20 = 240 mm. The 230 mm opening cannot accommodate it. Resolve the service or approved opening detail before installation rather than cutting engineered members.
Exam trap: Comparing only the bare 200 mm duct with the chase ignores the insulation that occupies space in the final assembly.
Standard reference: RSOS 2022 D-10.01.05P
Twenty deck boards each cross six supports. The surface detail requires three screws at each end support and two at each of the four intermediate supports. How many screws does this pattern require, excluding waste?
Answer: 280 screws.
Each board needs 2 × 3 = 6 screws at its ends plus 4 × 2 = 8 at intermediate supports, for 14 per board. Twenty boards therefore need 20 × 14 = 280 screws for the supplied pattern.
Exam trap: 240 screws assumes two at all six supports and misses the extra screw required at each end support.
Standard reference: RSOS 2022 D-11.01.08P
A stud wall with a door opening will be raised as one assembly. Its temporary bottom plate bridges the doorway and holds the jamb spacing during handling. At what stage should that portion be removed?
Answer: After the wall is positioned, secured and braced, with the opening geometry verified.
The temporary continuous plate helps preserve the assembly and opening during handling. Remove the doorway portion after the erected wall has the support and restraint needed to maintain the specified opening independently.
Exam trap: Cutting it out before lifting removes the temporary tie while the wall and jamb spacing are still being handled.
Standard reference: RSOS 2022 D-12.02.05P
A carried roof member’s hanger is marked to attach at a specific girder-truss panel point. Moving it 180 mm along the chord clears another component. Is chord fit alone enough to justify that relocation?
Answer: No. Retain the designed load-attachment location or obtain an approved revised truss connection detail.
Truss component placement determines where external loads enter the truss. Moving an attachment away from its specified panel point changes that loading, even if the hanger still physically fits the chord.
Exam trap: Assuming a continuous chord can receive the reaction anywhere ignores the truss design’s specified load entry point.
Standard reference: RSOS 2022 D-13.01.08P
On a framed exterior panel door, which members normally run vertically along the slab’s two outside edges?
Answer: The stiles.
Stiles form the vertical sides of a framed door slab. Rails run across the slab and connect those sides, supporting the door’s panel construction.
Exam trap: Rails are horizontal members; jambs belong to the surrounding frame rather than the slab.
Standard reference: RSOS 2022 E-14.02.01L
A skylight curb top is 180 mm above the roof deck. The roof assembly will add 95 mm above that deck, and the project requires 120 mm of curb above the finished roof. What minimum curb-height increase is needed?
Answer: 35 mm.
Existing finished-roof exposure is 180 − 95 = 85 mm. Required increase = 120 − 85 = 35 mm. Confirm the approved curb modification and flashing detail before installing the skylight.
Exam trap: Comparing 180 mm directly with 120 mm ignores the roofing buildup that will cover part of the curb.
Standard reference: RSOS 2022 E-15.01.09P
An Aquatac-primed wall has passed 30 minutes, the data sheet’s typical initial-set time at 23°C and 50% RH. This wall is cooler and more humid, and the film still transfers wet primer. What controls readiness for applying the self-adhered membrane?
Answer: The primer must actually dry fully before covering; delay the membrane while wet primer remains rather than accepting the elapsed initial-set time.
Initial set is not full drying, and laboratory timing does not verify this wall’s actual film condition. The maker requires full drying before covering; lower temperature can extend it. Retained dry tack is distinct from transferable wet primer.
Exam trap: Adding more primer or covering after the nominal 30 minutes does not make the observed wet film ready for bonding.
Standard reference: RSOS 2022 E-16.01.03P
A panel is 800 mm wide. Its drawing locates a pipe centre 120 mm from the finished face’s left edge. When viewed from the back, the back’s left edge is the finished face’s right edge. What distance from the back’s left edge locates that centre?
Answer: 680 mm.
The opposite viewing face reverses the left-edge reference. The centre is 800 − 120 = 680 mm from the back’s left edge, not 120 mm. Confirm the panel orientation before cutting the penetration.
Exam trap: Transferring 120 mm from the back’s left edge mirrors the hole to the wrong position.
Standard reference: RSOS 2022 F-17.03.03P
An unrated interior slab must fit an opening 2,010 mm high above the subfloor. The floor finish will add 12 mm; the project specifies a 3 mm head gap and 10 mm bottom gap above that finish. What finished slab height is needed?
Answer: 1,985 mm.
The finished floor reduces the available opening to 2,010 − 12 = 1,998 mm. Subtract the specified head and bottom gaps: 1,998 − 3 − 10 = 1,985 mm. These are supplied project clearances, not universal limits.
Exam trap: A 1,997 mm slab subtracts only the gaps and will be 12 mm too tall after the floor finish is laid.
Standard reference: RSOS 2022 F-19.02.02P
A towel bar spans 600 mm between the inner faces of its end sockets. The approved assembly requires 15 mm insertion into each socket. A 625 mm rod is centred between them. Does that rod provide the specified engagement?
Answer: No. At least 630 mm is needed; the centred 625 mm rod engages only 12.5 mm at each end.
Required rod length is 600 + 2 × 15 = 630 mm. The 625 mm rod has 25 mm total insertion, or 12.5 mm at each end when centred, which is less than the supplied 15 mm requirement.
Exam trap: Counting the 15 mm insertion once ignores the second socket that must retain the other rod end.
Standard reference: RSOS 2022 F-20.02.05P
An old plan labels a partition non-bearing, and the floor joists run parallel to it. Opening a small inspection area reveals a girder end seated on posts within that partition, with posts continuing below. What must the removal assessment recognize?
Answer: The partition contains a concentrated girder load path despite its old non-bearing label and parallel joists.
Joist direction and an old label do not account for the newly observed girder bearing and continuing posts. Those components indicate a concentrated load path that the removal assessment must trace and accommodate.
Exam trap: Calling the partition non-bearing because the joists are parallel overlooks the separate girder reaction.
Standard reference: RSOS 2022 G-21.01.02P
A retrofit bolt detail specifies tightening with dry threads. The nut has instead been lubricated, reducing thread friction, but the wrench reaches the specified torque. Does that reading alone establish the specified clamping condition?
Answer: No; lubrication changes the torque-to-clamp relationship, so the specified installation condition must be restored or qualified.
Torque is partly spent overcoming friction. Reducing thread friction can increase clamp load at the same indicated torque; the dry-condition specification cannot be verified from that torque reading alone.
Exam trap: Equal wrench torque does not imply equal clamp load when the thread-friction condition has changed.
Standard reference: RSOS 2022 G-22.01.10P