Sign in
Boilermaker Math
Online Red Seal Exam Preparation, built on official standardsMathQuestion 4 of 1070% to goContinue at question 4
10 questions
2 right · 1 wrong · 7 to do- 1Sling tension on a two-leg bridle
- 2Working load limit of 19 mm wire rope
- 3Clips and spacing for a 16 mm wire rope
- 4V-block opening for a 90° air bend
- 5The constant in the arc length formula
- 6Cut angle for a three-weld 90° elbow
- 7Wire rope capacity of a hoist drum
- 8Wrench size for a 3/4 in bolt
- 9Mass of a rolled shell plate
- 10Lead line pull on a four-part block
Part 1
2 right · 1 wrong · 7 to do- 1Sling tension on a two-leg bridleSling tension · Procedural and application
- 2Working load limit of 19 mm wire ropeWorking load limit · Procedural and application
- 3Clips and spacing for a 16 mm wire ropeNumber of wire rope clips · Critical thinking
- 4V-block opening for a 90° air bendV-block opening · Knowledge and recall
- 5The constant in the arc length formulaArc length · Knowledge and recall
- 6Cut angle for a three-weld 90° elbowFactors for angle of cut · Procedural and application
- 7Wire rope capacity of a hoist drumDrum capacity · Procedural and application
- 8Wrench size for a 3/4 in boltWrench size · Procedural and application
- 9Mass of a rolled shell plateCircumference and area of a rectangle · Critical thinking
- 10Lead line pull on a four-part blockLead line pull · Procedural and application
By question type
- Procedural and application2 of 6 done
- Critical thinking1 of 2 done
- Knowledge and recall0 of 2 done