Sign in
Mobile Crane Operator Math
Online Red Seal Exam Preparation, built on official standardsMathQuestion 4 of 1070% to goContinue at question 4
10 questions
2 right · 1 wrong · 7 to do- 1Weight of a precast concrete block
- 2Net capacity after the block and rigging
- 3Sling stress on a two-leg bridle
- 4Lift allowed by two slings at an angle
- 5Weight of a 600 mm steel pipe
- 6Weight of a 25 mm steel plate
- 7Chart capacity from pounds to kilograms
- 8Weight of a 24 in concrete pile
- 9The sheet's unit weight of concrete
- 10Tonnes to short tons on a U.S. chart
Part 1
2 right · 1 wrong · 7 to do- 1Weight of a precast concrete blockCube · Procedural and application
- 2Net capacity after the block and riggingNet capacity · Critical thinking
- 3Sling stress on a two-leg bridleStress · Procedural and application
- 4Lift allowed by two slings at an angleVertical capacity · Critical thinking
- 5Weight of a 600 mm steel pipePipe · Procedural and application
- 6Weight of a 25 mm steel platePlate steel · Procedural and application
- 7Chart capacity from pounds to kilogramsConversion · Procedural and application
- 8Weight of a 24 in concrete pileCylinder · Procedural and application
- 9The sheet's unit weight of concreteUnit weight · Knowledge and recall
- 10Tonnes to short tons on a U.S. chartConversion · Procedural and application
By question type
- Procedural and application2 of 7 done
- Critical thinking1 of 2 done
- Knowledge and recall0 of 1 done