Sign in
MathOnline Red Seal Exam Preparation, built on official standards
Powerline Technician math scenarios
MathQuestion 4 of 1070% to goContinue at question 4
10 questions
2 right · 1 wrong · 7 to do- 1Conductor tension from the sag
- 2Ruling span of a line section
- 3Vertical conductor load on a tangent structure
- 4The factor from lb/ft to kg/m
- 5Phase-to-phase voltage on a 14.4 kV wye system
- 6What ACSR on a conductor reel means
- 7Pull on a tugger line through three sheaves
- 8Load on a 120/240 V pole transformer
- 9A puller gauge in daN read in pounds
- 10Setting depth of a 35 ft pole in metres
Part 1
2 right · 1 wrong · 7 to do- 1Conductor tension from the sagConductor tension = weight × span² ÷ (8 × sag) · Procedural and application
- 2Ruling span of a line sectionRuling span = average span + ⅔ (maximum span − average span) · Procedural and application
- 3Vertical conductor load on a tangent structureConductor weight = (span A + span B) ÷ 2 × weight per unit × SF · Critical thinking
- 4The factor from lb/ft to kg/mConversion · Knowledge and recall
- 5Phase-to-phase voltage on a 14.4 kV wye systemWye phase-to-phase voltage = phase-to-ground voltage × 1.73 · Procedural and application
- 6What ACSR on a conductor reel meansAcronym · Knowledge and recall
- 7Pull on a tugger line through three sheavesPull = (weight + 10% weight × number of sheaves) ÷ MA · Procedural and application
- 8Load on a 120/240 V pole transformerkVA = (V1 × I1 + V2 × I2) ÷ 1 000 · Procedural and application
- 9A puller gauge in daN read in poundsConversion · Procedural and application
- 10Setting depth of a 35 ft pole in metresConversion · Procedural and application
By question type
- Procedural and application2 of 7 done
- Critical thinking1 of 1 done
- Knowledge and recall0 of 2 done