Sign in
MathOnline Red Seal Exam Preparation, built on official standards
Heavy Equipment Operator (Excavator) math scenarios
MathQuestion 4 of 1070% to goContinue at question 4
10 questions
2 right · 1 wrong · 7 to do- 1Bank measure of a sewer trench
- 2Rated lift with the hoe at a radius
- 3Bucket load of wet clay with a fill factor
- 4Production from an 18 second cycle
- 5Truck loads for the trench spoil
- 6Top width of a benched trench
- 7Fuel burn from a U.S. specification
- 8Excavator mass from the pound plate
- 9What bank measure means
- 10How heaped bucket capacity is rated
Part 1
2 right · 1 wrong · 7 to do- 1Bank measure of a sewer trenchVolume of a trench · Procedural and application
- 2Rated lift with the hoe at a radiusLift capacity (75% of tipping) · Critical thinking
- 3Bucket load of wet clay with a fill factorFill factor · Procedural and application
- 4Production from an 18 second cycleProduction · Procedural and application
- 5Truck loads for the trench spoilConversion · Procedural and application
- 6Top width of a benched trenchBenching · Procedural and application
- 7Fuel burn from a U.S. specificationConversion · Procedural and application
- 8Excavator mass from the pound plateConversion · Procedural and application
- 9What bank measure meansBank measure · Knowledge and recall
- 10How heaped bucket capacity is ratedHeaped capacity · Knowledge and recall
By question type
- Procedural and application2 of 7 done
- Critical thinking1 of 1 done
- Knowledge and recall0 of 2 done