MathOnline Red Seal Exam Preparation, built on official standards
Heavy Equipment Operator (Excavator) formula sheet and conversions
MathReference40 formulas · 58 conversions
On the exam
- Official formula sheet
- None for this trade
- Conversions
- Not given: learn them
- Calculator
- The same calculator as here
On the exam
Formula sheetNone for this trade
CalculatorThe same as here
Formulas
40 formulasThe Red Seal Program does not publish a formula sheet for this trade, so these are the formulas its math lessons use.
°F = 1.8 × °C + 32
°C = (°F − 32) / 1.8
K = °C + 273.15
Δ°F = 1.8 × Δ°C
1 US gal = 3.785411784 L; 1 Imperial gal = 4.54609 L
RectangleA = LW; perimeter = 2(L+W)
TriangleA = bh/2; perimeter = a+b+c
CircleA = πr² = πd²/4; C = πd
BoxV = LWH
CylinderV = πr²h
SphereV = 4πr³/3
Cone or pyramidV = base area × h/3
Triangular wedgeV = LWH/2
1 m³ = 1000 L
Cylinder side = 2πrh
Cylinder with one end = 2πrh + πr²
Closed cylinder = 2πrh + 2πr²
Closed box = 2(LW + LH + WH)
Open box = LW + 2LH + 2WH
Sphere = 4πr²
Cone lateral area = πrs
Pyramid lateral area = perimeter of base × slant height / 2
c² = a² + b²
sin θ = opposite/hypotenuse
cos θ = adjacent/hypotenuse
tan θ = opposite/adjacent
θ = atan(rise/run)
Offset travel = offset / sin θ
Arc length = πrθ/180 = πdθ/360
Sector pattern angle = 360 × base radius / slant radius
Equivalent formpattern angle = 180 × base diameter / slant radius
Grade (%) = rise/run × 100
Rise = run × unit rise/unit run
Symmetrical roof run = span/2
Rafter line length = √(run² + rise²)
Unit line length (per 12 of run) = √(12² + unit rise²)
New quantity = original quantity × scale factor
Scale factor = required yield / original yield
With p% addedfinal = original × (1+p/100)
Baker’s percentage = ingredient mass / flour mass × 100
Temperature and unit conversion
°F = 1.8 × °C + 32
°C = (°F − 32) / 1.8
K = °C + 273.15
Δ°F = 1.8 × Δ°C
1 US gal = 3.785411784 L; 1 Imperial gal = 4.54609 L
Areas, perimeter and circumference
RectangleA = LW; perimeter = 2(L+W)
TriangleA = bh/2; perimeter = a+b+c
CircleA = πr² = πd²/4; C = πd
Volumes, capacity and material quantities
BoxV = LWH
CylinderV = πr²h
SphereV = 4πr³/3
Cone or pyramidV = base area × h/3
Triangular wedgeV = LWH/2
1 m³ = 1000 L
Surface area of vessels and insulation
Cylinder side = 2πrh
Cylinder with one end = 2πrh + πr²
Closed cylinder = 2πrh + 2πr²
Closed box = 2(LW + LH + WH)
Open box = LW + 2LH + 2WH
Sphere = 4πr²
Cone lateral area = πrs
Pyramid lateral area = perimeter of base × slant height / 2
Pythagoras, trigonometry and offsets
c² = a² + b²
sin θ = opposite/hypotenuse
cos θ = adjacent/hypotenuse
tan θ = opposite/adjacent
θ = atan(rise/run)
Offset travel = offset / sin θ
Arc lengths and developed patterns
Arc length = πrθ/180 = πdθ/360
Sector pattern angle = 360 × base radius / slant radius
Equivalent formpattern angle = 180 × base diameter / slant radius
Grade, roof rise and run
Grade (%) = rise/run × 100
Rise = run × unit rise/unit run
Symmetrical roof run = span/2
Rafter line length = √(run² + rise²)
Unit line length (per 12 of run) = √(12² + unit rise²)
Percentages, recipe scaling and quantities
New quantity = original quantity × scale factor
Scale factor = required yield / original yield
With p% addedfinal = original × (1+p/100)
Baker’s percentage = ingredient mass / flour mass × 100
On the exam
ConversionsNot given: learn them
Conversions
58 conversions1 m³1 000 L
1 m³35.31 ft³
1 m³1.308 yd³
1 yd³27 ft³
1 ft³28.32 L
1 ft³7.481 US gal
1 ft³6.229 imp gal
1 L0.2642 US gal
1 L0.2200 imp gal
1 US gal3.785 L
1 imp gal4.546 L
1 in³16.39 mL
1 kg2.205 lb
1 lb0.4536 kg
1 lb16 oz
1 oz28.35 g
1 t (tonne)1 000 kg
1 t (tonne)2 205 lb
1 short ton2 000 lb
1 short ton907.2 kg
Water1 000 kg/m³ = 1 kg/L
Water62.4 lb/ft³
Water8.34 lb per US gal
Water10.0 lb per imp gal
Steel7 850 kg/m³ = 490 lb/ft³
Steel plate7.85 kg per m² per mm
Concrete2 400 kg/m³ = 150 lb/ft³
1 kg/m³0.06243 lb/ft³
1 lb/ft³16.02 kg/m³
Grade (%)rise ÷ run × 100
Angletan⁻¹(rise ÷ run)
1/4 in per ft2.08% (20.8 mm per m)
1/8 in per ft1.04% (10.4 mm per m)
2%1 in 50 (20 mm per m)
1:128.33% = 4.76°
45°1:1 = 100%
1 in25.4 mm
1 ft304.8 mm
1 ft0.3048 m
1 yd0.9144 m
1 m3.281 ft
1 m39.37 in
1 km0.6214 mi
1 mi1.609 km
1 km/h0.6214 mph
1 km/h0.2778 m/s
1 mph1.609 km/h
1 m/s3.281 ft/s
1 m/s196.9 ft/min
1 m/min3.281 ft/min
1 ft²144 in²
1 ft²0.0929 m²
1 m²10.76 ft²
1 yd²9 ft²
1 yd²0.8361 m²
1 ha10 000 m²
1 ha2.471 acres
1 acre4 047 m²
Volume
1 m³1 000 L
1 m³35.31 ft³
1 m³1.308 yd³
1 yd³27 ft³
1 ft³28.32 L
1 ft³7.481 US gal
1 ft³6.229 imp gal
1 L0.2642 US gal
1 L0.2200 imp gal
1 US gal3.785 L
1 imp gal4.546 L
1 in³16.39 mL
Mass
1 kg2.205 lb
1 lb0.4536 kg
1 lb16 oz
1 oz28.35 g
1 t (tonne)1 000 kg
1 t (tonne)2 205 lb
1 short ton2 000 lb
1 short ton907.2 kg
Density and unit mass
Water1 000 kg/m³ = 1 kg/L
Water62.4 lb/ft³
Water8.34 lb per US gal
Water10.0 lb per imp gal
Steel7 850 kg/m³ = 490 lb/ft³
Steel plate7.85 kg per m² per mm
Concrete2 400 kg/m³ = 150 lb/ft³
1 kg/m³0.06243 lb/ft³
1 lb/ft³16.02 kg/m³
Slope and grade
Grade (%)rise ÷ run × 100
Angletan⁻¹(rise ÷ run)
1/4 in per ft2.08% (20.8 mm per m)
1/8 in per ft1.04% (10.4 mm per m)
2%1 in 50 (20 mm per m)
1:128.33% = 4.76°
45°1:1 = 100%
Length
1 in25.4 mm
1 ft304.8 mm
1 ft0.3048 m
1 yd0.9144 m
1 m3.281 ft
1 m39.37 in
1 km0.6214 mi
1 mi1.609 km
Speed
1 km/h0.6214 mph
1 km/h0.2778 m/s
1 mph1.609 km/h
1 m/s3.281 ft/s
1 m/s196.9 ft/min
1 m/min3.281 ft/min
Area
1 ft²144 in²
1 ft²0.0929 m²
1 m²10.76 ft²
1 yd²9 ft²
1 yd²0.8361 m²
1 ha10 000 m²
1 ha2.471 acres
1 acre4 047 m²