Lather (Interior Systems Mechanic) math scenarios
MathQuestion 4 of 1070% to goContinue at question 4
10 questions
2 right · 1 wrong · 7 to do- 1Steel studs at 600 mm on centre for a partition
- 2Track lengths for a corridor
- 3Boxes of tile for a T-bar ceiling
- 4The formula to wrap a round column
- 5Squaring the ceiling grid
- 6Board for a round bulkhead
- 7Stud spacing of 16 in o.c. in millimetres
- 8A 4 ft by 12 ft sheet in square metres
- 9Sheets for a two-layer corridor wall
- 10Floor load under a pile of board
Part 1
2 right · 1 wrong · 7 to do- 1Steel studs at 600 mm on centre for a partitionLayout · Procedural and application
- 2Track lengths for a corridorConversion · Procedural and application
- 3Boxes of tile for a T-bar ceilingArea of a rectangle · Critical thinking
- 4The formula to wrap a round columnCircumference π D · Knowledge and recall
- 5Squaring the ceiling gridPythagorean theorem · Procedural and application
- 6Board for a round bulkheadArea of a circle π r² · Procedural and application
- 7Stud spacing of 16 in o.c. in millimetresConversion · Procedural and application
- 8A 4 ft by 12 ft sheet in square metresConversion · Procedural and application
- 9Sheets for a two-layer corridor wallArea of a rectangle · Procedural and application
- 10Floor load under a pile of boardLoad per square metre · Critical thinking
By question type
- Procedural and application2 of 7 done
- Critical thinking1 of 2 done