Bricklayer math scenarios
MathQuestion 4 of 1070% to goContinue at question 4
10 questions
2 right · 1 wrong · 7 to do- 1Modular bricks per square metre
- 2Brick order for a veneer with openings
- 3Length of a curved garden wall
- 4What C means in the curved wall formula
- 5Courses on a story pole for a 2 400 mm wall
- 6Lintel length for a 6 ft opening
- 7Sand in a 1:1:6 mortar batch
- 8Square feet of veneer to square metres
- 9Mortar strength from psi to MPa
- 10Tie spacing written as OC
Part 1
2 right · 1 wrong · 7 to do- 1Modular bricks per square metreUnits per square metre · Procedural and application
- 2Brick order for a veneer with openingsArea minus openings · Critical thinking
- 3Length of a curved garden wallArc length (π × R × C) ÷ 180 · Procedural and application
- 4What C means in the curved wall formulaArc length (π × R × C) ÷ 180 · Knowledge and recall
- 5Courses on a story pole for a 2 400 mm wallCourse gauge · Procedural and application
- 6Lintel length for a 6 ft openingConversion · Procedural and application
- 7Sand in a 1:1:6 mortar batchRatio · Procedural and application
- 8Square feet of veneer to square metresConversion · Procedural and application
- 9Mortar strength from psi to MPaConversion · Procedural and application
- 10Tie spacing written as OCAcronym · Knowledge and recall
By question type
- Procedural and application2 of 7 done
- Critical thinking1 of 1 done
- Knowledge and recall0 of 2 done