Pass Your Red Seal
Exams

Online Red Seal Exam Preparation, built on official standards

only $14.99

  • Full trade access
  • 12 months
Unlock full access

Pay once, good for a full year.

Tilesetter

Built on official standards for your trade

Practice exams split like the real exam.
Every answer explained.

only $14.99

  • Full trade access
  • 12 months
Unlock full access

Pay once, good for a full year.

8
Practice exams
800
Questions
200
Flashcards
1,000+
Flashcard Match
50+
Trade math
100+
Simulations
Try Tilesetter free12 sample questions now, or Exam 1 with a free account12 sample questionsFree Exam 1

Practice exams

8 exams · 100 questions each

Exam 1 is free. Create a free account and retake it as often as you like, with no expiry. How it works

8 practice exams and 800 original practice questions with answers and explanations, plus 200 flashcards in two exam-weighted sets, for the 100-question Tilesetter Red Seal exam. Timed or untimed, with pause and resume. 100 questions in the real exam · 4 hours · 70% pass mark.

Tilesetter sample exam questions

Take them as an exam

12 free practice questions with answers and explanations. No account needed.

Sample 1 Tilesetter, free sample

A grinding task’s hazard assessment requires primary impact eye protection, added face protection, hearing protection and suitable close-fitting hand protection. Dust controls and the correct grinder guard are in place. Which PPE combination satisfies those requirements?

Answer Impact-rated safety glasses beneath a face shield, hearing protection and suitable snug gloves.
Why The supplied assessment requires both primary eye protection and added face protection, plus hearing and suitable hand protection. A face shield alone does not replace the specified primary eye protection. The other combinations omit face protection and use loose gloves that can create a snagging risk; one also omits hearing protection. PPE supplements the established controls and correct guarding.
2. The lift plan requires a basket hitch around a protected stone pack weighing 680 kg. The sling tag rates that exact basket configuration at 900 kg and a choker configuration at 600 kg. All other components exceed 900 kg and the inspection is satisfactory. Which capacity comparison applies?
Answer Compare the pack mass with the 900 kg basket-hitch rating
Why Use the rating for the actual hitch and geometry: 680 kg is below the stated 900 kg basket limit. The 600 kg choker rating belongs to another configuration. Dividing or doubling the load does not replace the tagged configuration rating. This comparison assumes the protected edges, actual geometry and remaining lift-plan conditions stated in the question are satisfied.
3. Two waterproofing sheets end at a straight joint with an 8 mm gap between them. The approved seam detail requires a centred bonding strip with at least 50 mm overlap onto each sheet. What minimum strip width satisfies that geometry?
Answer Use a strip at least 108 mm wide across the gap
Why The strip must span 50 mm on one sheet, the 8 mm opening and 50 mm on the other: 108 mm total. A 100 mm strip would provide only 46 mm per side when centred. The 58 mm and 50 mm choices allow roughly one overlap rather than two. Use an available approved strip meeting or exceeding the calculated width.
4. A centred-drain prefabricated shower tray is 1,000 mm wide. The approved instructions permit equal trimming from opposite edges. The opening is 940 mm wide and the drain must remain centred. How should the tray be trimmed?
Answer Trim 30 mm from each of the two opposing tray edges
Why The total reduction is 1,000 − 940 = 60 mm; equal trimming removes 30 mm from each opposing edge and retains the drain centre. Removing 60 mm from one edge or splitting it 45/15 shifts the centre relative to the opening. Fifteen millimetres per side removes only 30 mm and leaves the tray too wide.
5. A mixed-format pattern compares one 600 mm tile with a pair of 300 mm tiles along the same direction. Every joint is 3 mm. Each repeating block includes its trailing boundary joint; the pair also has one internal joint. Why do the large-tile and paired-small-tile blocks lose alignment when repeated without changing this layout?
Answer The small format repeats at 606 mm and the large at 603 mm.
Why The large block repeats at 600 + 3 = 603 mm; the paired-small block repeats at 300 + 3 + 300 + 3 = 606 mm. The additional internal joint creates a 3 mm difference per repeat. Reversing the two lengths assigns that extra joint to the wrong block. Calling both 603 mm omits the internal joint; calling both 606 mm adds a nonexistent joint to the large block. The nominal tile lengths alone do not establish modular compatibility.
6. An approved interior layout limits uninterrupted tile-field length to 4.0 m. A straight 11.4 m run has movement joints at both ends. The designer requests three equal fields. Where should the two additional joints be set out from the first end?
Answer Locate the joints at 3.8 m and 7.6 m from the first end
Why Three equal fields are 11.4 ÷ 3 = 3.8 m each, so joints fall at 3.8 and 7.6 m and every field meets the 4.0 m limit. Positions at 4.0 and 8.0 m meet the maximum but fail the equal-field request. The other arrangements leave a 5.7 m field. Both the maximum length and the stated layout preference must be satisfied.
7. An approved L-cut in porcelain requires a 6 mm inside radius. The method specifies drilling the corner relief before joining it with straight cuts, without saw overruns beyond the tangent points. What relief-hole diameter produces that radius?
Answer Use a 12 mm diameter relief hole before making the straight cuts
Why Diameter is twice radius, so a 6 mm inside radius requires a 12 mm relief hole under the stated method. A 6 mm hole provides only 3 mm radius; a 3 mm hole provides 1.5 mm. Eighteen millimetres adds an extra radius and changes the specified corner. The straight cuts must still terminate as detailed.
8. The project dry-pack recipe is one volume of cement to four volumes of dry sand, measured with the same level bucket. Six buckets of cement are available. How many buckets of dry sand are needed for that recipe?
Answer Measure 24 level buckets of dry sand for the batch
Why The sand quantity is four times the cement volume: 6 × 4 = 24 equal buckets. Thirty counts five sand volumes per cement volume instead of four. Eighteen uses a three-to-one ratio, while twenty corresponds to only five buckets of cement at the specified ratio. The question supplies a volume recipe; it does not authorize substituting equal masses.
9. Straight parallel mortar ridges remain largely uncollapsed after a large tile is placed. The mortar is fresh and the tile can still be adjusted. Which motion most directly helps the ridges collapse and air escape?
Answer Slide the tile back and forth across the ridges while embedding it.
Why Movement across straight mortar ridges pushes mortar into adjoining channels and helps air escape as the ridges collapse. Moving mainly along the ridges is less effective at closing those channels. Both circular-ridge choices can enclose pockets of air; lowering or rotating the tile does not remove that pattern-related limitation. Lift representative tiles to verify actual contact and support. The embedding motion by itself does not guarantee the required coverage.
10. An approved slab layout numbers panels left to right as 4, 7 and 9 when viewed from the room. Installers are working from behind the support frame, looking toward the room. Which left-to-right order do they see from their side?
Answer From behind, the left-to-right sequence is panel 9, then 7, then 4
Why Viewing the same row from the opposite side reverses left and right, so the back view is 9, 7, 4. Keeping 4, 7, 9 copies the room-side order into the wrong viewpoint. The other sequences rotate or swap selected panels rather than reversing the complete row; panel orientation within the assembly must still follow its references.
11. An epoxy-terrazzo topping has a specified compacted thickness of 9 mm across a 6.0 m² bay. Ignore waste and grinding allowance for this calculation. What compacted topping volume does the bay require?
Answer Provide 0.054 m³ of compacted topping for the 6.0 m² bay
Why Convert 9 mm to 0.009 m and multiply by 6.0 m²: 0.054 m³. The 0.540 m³ result uses a thickness ten times too large. The 0.006 m³ result corresponds to only 1 mm over the bay, and 0.009 m³ covers only one square metre at the specified thickness. Actual ordering must separately include specified allowances.
12. A sealant detail requires compressible backing 25% larger than the measured joint width. The opening is uniformly 16 mm and the selected backing product permits that compression. What backing diameter follows from the stated requirement?
Answer Select a 20 mm diameter rod for the stated 25% oversize requirement
Why The required diameter is 16 × 1.25 = 20 mm. A 16 mm rod has no specified oversize; 12 mm subtracts 25% and is undersized. Twenty-five is a percentage in the premise, not the required diameter in millimetres. The compression allowance is product-specific supplied data.

Start free

Interactive simulations

Animated simulations built for Red Seal trades. See inside pumps, transmissions, air brakes, gears and heavy machinery, watch every part move, and interact with each one as it runs.

Diagrams and symbols

Learn to read the diagrams and schematic symbols used in your trade.

How things work

Animated section drawings show what happens inside the equipment as it runs.

Terminology

Learn the correct name and job of every part.

Exam breakdown

Red Seal practice tests and exam prep

The official Tilesetter Red Seal exam, also called the interprovincial (IP) exam, has 100 questions across 6 topic blocks. Open a block to see its tasks and subtasks.

100
Multiple choice questions
4 hours
Writing time
70%
Pass mark
Major Work Activity% of examReal examPractice bank
AOccupational skills12%1296

A-1 · Performs safety-related functions

4 official exam questions · 26 in the practice bank

  • A-1.01 Maintains safe work environment
  • A-1.02 Uses personal protective equipment (PPE) and safety equipment

A-2 · Uses and maintains tools and equipment

4 official exam questions · 31 in the practice bank

  • A-2.01 Uses tools and equipment
  • A-2.02 Uses access equipment
  • A-2.03 Uses rigging, hoisting and lifting equipment

A-3 · Organizes work

4 official exam questions · 39 in the practice bank

  • A-3.01 Estimates materials, supplies and labour
  • A-3.02 Organizes materials, supplies and work site
  • A-3.03 Evaluates damages and deficiencies
  • A-3.04 Uses communication techniques
  • A-3.05 Uses mentoring techniques
BSubstrate preparation15%15120

B-4 · Removes existing finishes

4 official exam questions · 28 in the practice bank

  • B-4.01 Removes surface coverings
  • B-4.02 Cleans surfaces

B-5 · Evaluates and prepares surface

7 official exam questions · 60 in the practice bank

  • B-5.01 Assesses existing substrate
  • B-5.02 Installs membranes
  • B-5.03 Installs mortar beds
  • B-5.04 Installs underlayments

B-6 · Installs specialty products

4 official exam questions · 32 in the practice bank

  • B-6.01 Installs sound barrier products
  • B-6.02 Installs in-floor heating
  • B-6.03 Installs engineered products
CLayouts21%21168

C-7 · Lays out work area

16 official exam questions · 134 in the practice bank

  • C-7.01 Confirms site measurements
  • C-7.02 Determines tile layout for best visual effect
  • C-7.03 Lays out grid lines
  • C-7.04 Evaluates rise and run of stairs

C-8 · Evaluates joints

5 official exam questions · 34 in the practice bank

  • C-8.01 Accommodates existing joints
  • C-8.02 Determines additional joint requirements
DMaterial preparation14%14112

D-9 · Inspects materials

3 official exam questions · 24 in the practice bank

  • D-9.01 Confirms material consistencies
  • D-9.02 Checks materials for damage

D-10 · Prepares material for installation

6 official exam questions · 44 in the practice bank

  • D-10.01 Prepares tiles
  • D-10.02 Prepares stone slabs

D-11 · Mixes materials

5 official exam questions · 44 in the practice bank

  • D-11.01 Mixes materials for tile and stone
  • D-11.02 Mixes materials for mortar beds
  • D-11.03 Mixes materials for terrazzo
EMaterial setting24%24192

E-12 · Installs tiles

13 official exam questions · 107 in the practice bank

  • E-12.01 Applies setting material
  • E-12.02 Sets tiles
  • E-12.03 Installs accessories
  • E-12.04 Installs expansion and control joints
  • E-12.05 Installs tile trim

E-13 · Installs stone slabs

7 official exam questions · 53 in the practice bank

  • E-13.01 Installs anchors
  • E-13.02 Applies stone slab setting material
  • E-13.03 Mounts stone slabs
  • E-13.04 Sets stone slabs

E-14 · Pours terrazzo mixture

4 official exam questions · 32 in the practice bank

  • E-14.01 Installs divider strips for terrazzo
  • E-14.02 Applies bond coat
  • E-14.03 Trowels in terrazzo mixture
  • E-14.04 Works surface
FFinishing14%14112

F-15 · Finishes installed product

9 official exam questions · 71 in the practice bank

  • F-15.01 Installs grout
  • F-15.02 Caulks joints
  • F-15.03 Seals material

F-16 · Finishes terrazzo and stone

5 official exam questions · 41 in the practice bank

  • F-16.01 Grinds terrazzo and stone
  • F-16.02 Grouts terrazzo and stone
  • F-16.03 Seals terrazzo and stone

Source: the official Tilesetter standard and exam breakdown. Check your own requirements with your province or territory.

Questions about Tilesetter exam prep

Study guide
Is there a free Tilesetter Red Seal practice test?

Yes. Tilesetter Exam 1 is a full practice exam of 100 questions with an explanation for every answer. It is free with a free account in every available trade: unlimited retakes, no expiry and no credit card. The same account plays Question Match with Exam 1. Without an account, try 12 sample questions, math formulas, 20 flashcards and Flashcard Match.

Is there a Tilesetter practice test with answers?

Yes. Every Tilesetter practice question comes with its correct answer and an explanation of why it is right. In the free 12-question sample, submit your answers to see the correct answers, the explanations and your score, with no account. Exam 1, free with a free account, and every paid exam also show your score by Major Work Activity. These are original practice questions, not real exam questions.

How many questions are on the Tilesetter Red Seal exam?

The official Tilesetter Red Seal exam has 100 multiple-choice questions. Each question has four options and one correct answer. The writing time is four hours and the pass mark is 70%: at least 70 of 100 questions correct.

What topics are on the Tilesetter Red Seal exam?

The published exam breakdown has 6 Major Work Activities (MWAs) or blocks: A, Occupational skills (12 questions); B, Substrate preparation (15 questions); C, Layouts (21 questions); D, Material preparation (14 questions); E, Material setting (24 questions); F, Finishing (14 questions).

Can I challenge the Tilesetter Red Seal exam without an apprenticeship?

Yes. Experienced workers apply to their provincial or territorial authority as trade qualifiers (challengers in New Brunswick, a Trade Equivalency Assessment in Ontario); once it verifies your documented hands-on hours, you write the same 100-question Red Seal exam as a completing apprentice. Quebec has no challenge exam: where it certifies the trade, experienced workers earn a Quebec certificate first, by recognition of their hours or skills, and then enrol in its Red Seal Program. The federal Ellis Chart lists the hours each authority requires for this trade, from 5,600 in Ontario to 10,800 in Saskatchewan (read 2026-10-29); the table on this page shows every province. Buying practice material does not make you eligible; the authority decides.

How do your Tilesetter practice exams follow the official breakdown?

Every practice question maps to an MWA and task, and nearly every question maps to a specific subtask. Numbered practice exams match the published question count for each MWA. Mixed exams combine questions from your trade’s numbered exams; their topic distribution can vary.

What are Flashcard Match and Question Match?

Flashcard Match deals a board of Tilesetter flashcards on the left and their answers, shuffled, on the right; you match each card to its answer. Question Match does the same with Tilesetter practice exam questions. Every round deals a new mix, so there are more than 1,000 different rounds of each.

How many Tilesetter practice exams are included?

Pass Your Red Seal includes 8 practice exams and 800 original practice questions for Tilesetter. Study access includes answers, explanations, practice and timed modes, and results by topic. The practice-bank total covers all available exams; it is separate from the 100 questions on the official exam.

Are Tilesetter flashcards included?

Yes. Every Tilesetter plan includes 200 flashcards in two exam-weighted sets of 100 cards. Each set follows the Major Work Activity and task question counts of the official National Occupational Analysis - Tilesetter (2010) exam breakdown. Review the answer, reasoning, exam trap and standard reference on each card, then use your flashcard score by Major Work Activity to focus your next review.

Can I try Tilesetter practice questions for free?

Yes. Try 12 free Tilesetter questions without an account or payment. The sample uses the same format as the full exams: answer one question at a time, navigate between questions, submit your answers, and review your score and explanations. Create a free account to take Exam 1, a full practice exam, in every available trade: unlimited retakes, no expiry and no credit card. Review explanations and your score by MWA, and play Question Match with Exam 1’s questions. Exams 2 onward, mixed exams, paid flashcards and full Flashcard Match and Question Match require paid access for that trade.

How much does Tilesetter study access cost?

Study access for Tilesetter costs $8.99 for 1 month or $14.99 for 12 months. Each plan covers this one trade. Pay once, or choose optional renewal with the 1 month plan: $8.99 for the first month, then $5.99 a month. Stop future renewals in your account.

Challenge the Tilesetter exam without an apprenticeship

How it works

Experienced workers in the tilesetter trade can write this Red Seal exam as trade qualifiers once their province verifies enough hands-on experience. The hours below are the figures each authority reports to the federal Ellis Chart, read 29 October 2026; the trade’s own form or profile sets the final rule, and each province’s guide has the forms, fees and steps.

Experience required to challenge the Tilesetter Red Seal exam
Province or territory, with its guideHours to challengeApprenticeship and certification
British Columbia6,750Apprenticeship 4,860 hours · voluntary certification
AlbertaNot shown
Saskatchewan10,800Apprenticeship 7,200 hours · voluntary certification
ManitobaNot shown
Ontario
Terrazzo, Tile and Marble Setter
5,600Apprenticeship 5,600 hours · voluntary certification
QuebecQuebec certificate firstApprenticeship 6,000 hours · compulsory certification
New Brunswick9,000Voluntary certification
Nova Scotia8,100Apprenticeship 5,400 hours · voluntary certification
Prince Edward Island8,000Voluntary certification
Newfoundland and Labrador8,100Voluntary certification
YukonNot shown
Northwest TerritoriesNot shown
NunavutNot shown

Source: Ellis Chart, Tilesetter, published by the Canadian Council of Directors of Apprenticeship. Each authority sets and changes its own rules; confirm the current figure on its page before you apply.