MathOnline Red Seal Exam Preparation, built on official standards
Appliance Service Technician formula sheet, conversions and acronyms
MathReference82 formulas · 54 conversions · 27 acronyms
On the exam
- Official formula sheet
- None for this trade
- Conversions
- Not given: learn them
- Acronyms
- You get the list
- Calculator
- The same calculator as here
On the exam
Formula sheetNone for this trade
CalculatorThe same as here
Formulas
82 formulasThe Red Seal Program does not publish a formula sheet for this trade, so these are the formulas its math lessons use.
V = I × R
I = V / R
R = V / I
Rₜ = R₁ + R₂ + …
Vₜ = V₁ + V₂ + …
1/Rₜ = 1/R₁ + 1/R₂ + …
Rₜ = R₁R₂ / (R₁ + R₂) (two branches)
Rₜ = R / n (n equal branches)
ΣI entering = ΣI leaving
ΣV around a closed loop = 0
P = VI = I²R = V²/R (DC resistive load)
E = P × t
1 hp ≈ 746 W
Vout = Vin × R₂ / (R₁ + R₂)
I₁ = Iₜ × R₂ / (R₁ + R₂) (two parallel branches)
SeriesRₜ = R₁ + R₂ + … + Rₙ
Parallel1/Rₜ = 1/R₁ + 1/R₂ + … + 1/Rₙ
I = V/R
Unloaded dividerVout = Vin × R₂/(R₁ + R₂)
S₁φ = VI
P₁φ = VI × PF
S₃φ = √3 × Vline × Iline
P₃φ = √3 × Vline × Iline × PF = 3 × Vphase × Iphase × PF
PF = P/S = cos φ (sinusoidal voltage and current)
Np/Ns = Vp/Vs = Is/Ip (ideal transformer)
WyeVline = √3 × Vphase; Iline = Iphase
DeltaIline = √3 × Iphase; Vline = Vphase
Isc ≈ Irated / (Z% / 100)
Ns = 120f / p
f = pNs / 120
Slip (%) = (Ns − Nr) / Ns × 100
Vrms = Vpeak / √2
Vpeak = √2 × Vrms
Full-wave rectified average = 2 × Vpeak / π ≈ 0.6366 × Vpeak
F = P × A
A = πd²/4
Retracting annular area = π(D² − d²)/4
°F = 1.8 × °C + 32
°C = (°F − 32) / 1.8
K = °C + 273.15
Δ°F = 1.8 × Δ°C
1 US gal = 3.785411784 L; 1 Imperial gal = 4.54609 L
RectangleA = LW; perimeter = 2(L+W)
TriangleA = bh/2; perimeter = a+b+c
CircleA = πr² = πd²/4; C = πd
BoxV = LWH
CylinderV = πr²h
SphereV = 4πr³/3
Cone or pyramidV = base area × h/3
Triangular wedgeV = LWH/2
1 m³ = 1000 L
Cylinder side = 2πrh
Cylinder with one end = 2πrh + πr²
Closed cylinder = 2πrh + 2πr²
Closed box = 2(LW + LH + WH)
Open box = LW + 2LH + 2WH
Sphere = 4πr²
Cone lateral area = πrs
Pyramid lateral area = perimeter of base × slant height / 2
c² = a² + b²
sin θ = opposite/hypotenuse
cos θ = adjacent/hypotenuse
tan θ = opposite/adjacent
θ = atan(rise/run)
Offset travel = offset / sin θ
Arc length = πrθ/180 = πdθ/360
Sector pattern angle = 360 × base radius / slant radius
Equivalent formpattern angle = 180 × base diameter / slant radius
Grade (%) = rise/run × 100
Rise = run × unit rise/unit run
Symmetrical roof run = span/2
Rafter line length = √(run² + rise²)
Unit line length (per 12 of run) = √(12² + unit rise²)
η = useful output / input
COPcooling = cooling effect / compressor work
COPheating = heat delivered / compressor work
Heat rejected = cooling effect + compressor work
For the same idealized balanceCOPheating = COPcooling + 1
New quantity = original quantity × scale factor
Scale factor = required yield / original yield
With p% addedfinal = original × (1+p/100)
Baker’s percentage = ingredient mass / flour mass × 100
Ohm’s law
V = I × R
I = V / R
R = V / I
Resistors in series
Rₜ = R₁ + R₂ + …
Vₜ = V₁ + V₂ + …
Resistors in parallel
1/Rₜ = 1/R₁ + 1/R₂ + …
Rₜ = R₁R₂ / (R₁ + R₂) (two branches)
Rₜ = R / n (n equal branches)
Kirchhoff’s current and voltage laws
ΣI entering = ΣI leaving
ΣV around a closed loop = 0
Electrical power and energy
P = VI = I²R = V²/R (DC resistive load)
E = P × t
1 hp ≈ 746 W
Voltage and current dividers
Vout = Vin × R₂ / (R₁ + R₂)
I₁ = Iₜ × R₂ / (R₁ + R₂) (two parallel branches)
Reading circuit diagrams and calculating values
SeriesRₜ = R₁ + R₂ + … + Rₙ
Parallel1/Rₜ = 1/R₁ + 1/R₂ + … + 1/Rₙ
I = V/R
Unloaded dividerVout = Vin × R₂/(R₁ + R₂)
AC power, power factor and three-phase loads
S₁φ = VI
P₁φ = VI × PF
S₃φ = √3 × Vline × Iline
P₃φ = √3 × Vline × Iline × PF = 3 × Vphase × Iphase × PF
PF = P/S = cos φ (sinusoidal voltage and current)
Transformers, wye/delta and fault-current estimates
Np/Ns = Vp/Vs = Is/Ip (ideal transformer)
WyeVline = √3 × Vphase; Iline = Iphase
DeltaIline = √3 × Iphase; Vline = Vphase
Isc ≈ Irated / (Z% / 100)
Motor speed, frequency and slip
Ns = 120f / p
f = pNs / 120
Slip (%) = (Ns − Nr) / Ns × 100
RMS, peak and rectified average
Vrms = Vpeak / √2
Vpeak = √2 × Vrms
Full-wave rectified average = 2 × Vpeak / π ≈ 0.6366 × Vpeak
Pressure, force and piston area
F = P × A
A = πd²/4
Retracting annular area = π(D² − d²)/4
Temperature and unit conversion
°F = 1.8 × °C + 32
°C = (°F − 32) / 1.8
K = °C + 273.15
Δ°F = 1.8 × Δ°C
1 US gal = 3.785411784 L; 1 Imperial gal = 4.54609 L
Areas, perimeter and circumference
RectangleA = LW; perimeter = 2(L+W)
TriangleA = bh/2; perimeter = a+b+c
CircleA = πr² = πd²/4; C = πd
Volumes, capacity and material quantities
BoxV = LWH
CylinderV = πr²h
SphereV = 4πr³/3
Cone or pyramidV = base area × h/3
Triangular wedgeV = LWH/2
1 m³ = 1000 L
Surface area of vessels and insulation
Cylinder side = 2πrh
Cylinder with one end = 2πrh + πr²
Closed cylinder = 2πrh + 2πr²
Closed box = 2(LW + LH + WH)
Open box = LW + 2LH + 2WH
Sphere = 4πr²
Cone lateral area = πrs
Pyramid lateral area = perimeter of base × slant height / 2
Pythagoras, trigonometry and offsets
c² = a² + b²
sin θ = opposite/hypotenuse
cos θ = adjacent/hypotenuse
tan θ = opposite/adjacent
θ = atan(rise/run)
Offset travel = offset / sin θ
Arc lengths and developed patterns
Arc length = πrθ/180 = πdθ/360
Sector pattern angle = 360 × base radius / slant radius
Equivalent formpattern angle = 180 × base diameter / slant radius
Grade, roof rise and run
Grade (%) = rise/run × 100
Rise = run × unit rise/unit run
Symmetrical roof run = span/2
Rafter line length = √(run² + rise²)
Unit line length (per 12 of run) = √(12² + unit rise²)
Efficiency, COP and heat rejection
η = useful output / input
COPcooling = cooling effect / compressor work
COPheating = heat delivered / compressor work
Heat rejected = cooling effect + compressor work
For the same idealized balanceCOPheating = COPcooling + 1
Percentages, recipe scaling and quantities
New quantity = original quantity × scale factor
Scale factor = required yield / original yield
With p% addedfinal = original × (1+p/100)
Baker’s percentage = ingredient mass / flour mass × 100
On the exam
ConversionsNot given: learn them
Conversions
54 conversionsPower (W)V × A
1 kW1 000 W
1 kVA1 000 VA
1 hp746 W
1 mA0.001 A
1 mV0.001 V
1 kΩ1 000 Ω
1 MΩ1 000 000 Ω
1 kWh1 kW for 1 hour
1 hp746 W
1 kW1.341 hp
1 kW3 412 Btu/h
1 Btu/h0.2931 W
1 Btu1.055 kJ
1 ton of refrigeration12 000 Btu/h
1 ton of refrigeration3.517 kW
1 kWh3.6 MJ
1 therm100 000 Btu
1 boiler hp33 475 Btu/h
°C to °F× 1.8, then + 32
°F to °C− 32, then ÷ 1.8
°C to K+ 273.15
A difference of 1 °C1.8 °F
Water freezes0 °C = 32 °F
Water boils (sea level)100 °C = 212 °F
1 L/s60 L/min
1 L/s3.6 m³/h
1 L/s15.85 US gpm
1 L/s13.20 imp gpm
1 US gpm3.785 L/min
1 imp gpm4.546 L/min
1 cfm0.4719 L/s
1 cfm1.699 m³/h
1 m³/h0.5886 cfm
1 m³1 000 L
1 m³35.31 ft³
1 m³1.308 yd³
1 yd³27 ft³
1 ft³28.32 L
1 ft³7.481 US gal
1 ft³6.229 imp gal
1 L0.2642 US gal
1 L0.2200 imp gal
1 US gal3.785 L
1 imp gal4.546 L
1 in³16.39 mL
1 in25.4 mm
1 ft304.8 mm
1 ft0.3048 m
1 yd0.9144 m
1 m3.281 ft
1 m39.37 in
1 km0.6214 mi
1 mi1.609 km
Electrical
Power (W)V × A
1 kW1 000 W
1 kVA1 000 VA
1 hp746 W
1 mA0.001 A
1 mV0.001 V
1 kΩ1 000 Ω
1 MΩ1 000 000 Ω
1 kWh1 kW for 1 hour
Power and energy
1 hp746 W
1 kW1.341 hp
1 kW3 412 Btu/h
1 Btu/h0.2931 W
1 Btu1.055 kJ
1 ton of refrigeration12 000 Btu/h
1 ton of refrigeration3.517 kW
1 kWh3.6 MJ
1 therm100 000 Btu
1 boiler hp33 475 Btu/h
Temperature
°C to °F× 1.8, then + 32
°F to °C− 32, then ÷ 1.8
°C to K+ 273.15
A difference of 1 °C1.8 °F
Water freezes0 °C = 32 °F
Water boils (sea level)100 °C = 212 °F
Flow
1 L/s60 L/min
1 L/s3.6 m³/h
1 L/s15.85 US gpm
1 L/s13.20 imp gpm
1 US gpm3.785 L/min
1 imp gpm4.546 L/min
1 cfm0.4719 L/s
1 cfm1.699 m³/h
1 m³/h0.5886 cfm
Volume
1 m³1 000 L
1 m³35.31 ft³
1 m³1.308 yd³
1 yd³27 ft³
1 ft³28.32 L
1 ft³7.481 US gal
1 ft³6.229 imp gal
1 L0.2642 US gal
1 L0.2200 imp gal
1 US gal3.785 L
1 imp gal4.546 L
1 in³16.39 mL
Length
1 in25.4 mm
1 ft304.8 mm
1 ft0.3048 m
1 yd0.9144 m
1 m3.281 ft
1 m39.37 in
1 km0.6214 mi
1 mi1.609 km
On the exam
AcronymsYou get the list
Acronyms
27 acronymsThe following acronyms used in this trade may be on its Red Seal exam. They will also be provided with the exam sitting. The official list (PDF)
Aampere
ACalternating current
AWGAmerican wire gauge
cfmcubic feet per minute
CWclockwise
DCdirect current
ETCelectronic temperature control
F.F.fresh food
HEhigh efficiency
Hgmercury
in.inch
L.E.D.light-emitting diode
mmeter
M.O.V.metal oxide varistor
mAmilliampere
NCnormally closed
NOnormally open
NPTNational Pipe Threading
NTCnegative temperature coefficient
psigpounds per square inch gauge
PTCpositive temperature coefficient
RFradio frequency
rpmrevolutions per minute
RTDresistance temperature detector
Vvolt
Wwatt
µmicron
Aampere
ACalternating current
AWGAmerican wire gauge
cfmcubic feet per minute
CWclockwise
DCdirect current
ETCelectronic temperature control
F.F.fresh food
HEhigh efficiency
Hgmercury
in.inch
L.E.D.light-emitting diode
mmeter
M.O.V.metal oxide varistor
mAmilliampere
NCnormally closed
NOnormally open
NPTNational Pipe Threading
NTCnegative temperature coefficient
psigpounds per square inch gauge
PTCpositive temperature coefficient
RFradio frequency
rpmrevolutions per minute
RTDresistance temperature detector
Vvolt
Wwatt
µmicron