Pass Your Red Seal

Plumber

Online Red Seal Exam Preparation, built on official standards
FREE SAMPLEQuestion 1 of 12Block B · Prepares and assembles tube, tubing and pipe
Question 1 of 12Block B · Prepares and assembles tube, tubing and pipe

Plumber

Question 1 of 12 · Task B-7 An annealed copper water-service tube requires a joint beneath a building. The joint will be buried and must be made without heating the tube. Which connection is permitted?

B-7.01

An annealed copper water-service tube requires a joint beneath a building. The joint will be buried and must be made without heating the tube. Which connection is permitted?

0:00:00so farUntimedPass mark 70%

Questions

0 of 12 answered · 12 to go

Free Exam 1

Exam 1 is free in every trade, with unlimited retakes and no expiry.

  • All 125 questions, in the same numbers as the official exam
  • Timed or untimed
  • Pause and resume
  • Score by exam block

Built for the current exam

The Red Seal Plumber exam uses the 2023 RSOS and the 2020 National Plumbing Code of Canada.

  • Every question follows the 2023 RSOS
  • Code answers checked in the 2020 NPC
  • Official task counts and question types
  • National scope, nothing provincial
  • Every answer explained
  • Flashcards follow the same 2023 RSOS