Question 1 of 12 · Task B-7 An annealed copper water-service tube requires a joint beneath a building. The joint will be buried and must be made without heating the tube. Which connection is permitted?
B-7.01
An annealed copper water-service tube requires a joint beneath a building. The joint will be buried and must be made without heating the tube. Which connection is permitted?
Questions
0 of 12 answered · 12 to goFree Exam 1
Exam 1 is free in every trade, with unlimited retakes and no expiry.
- All 125 questions, in the same numbers as the official exam
- Timed or untimed
- Pause and resume
- Score by exam block
Built for the current exam
Plumber RSOS 2023National Plumbing Code of Canada 2020
The Red Seal Plumber exam uses the 2023 RSOS and the 2020 National Plumbing Code of Canada.
- Every question follows the 2023 RSOS
- Code answers checked in the 2020 NPC
- Official task counts and question types
- National scope, nothing provincial
- Every answer explained
- Flashcards follow the same 2023 RSOS